Make Payment      book nowt         

Rapid Span Batch Plant

Rapid span batch plant

Rapid Span turned to Bourcet Engineering to act as the co-coordinating professional and structural engineer on a new batch plant for their growing operations. Our role was to design and engineer the specialized foundations to accommodate their equipment and pre-engineered building to ensure all the components were integrated. Sections of the foundation required up to 40 foot deep excavation in a confined site, requiring special soil retention. Most of this took place during an accelerated schedule and solutions had to be made quickly when issues were found on site.